Port maintenance dredging in Douala – Cameroon

Scope of the project: six basins had to be dredged with the Beaver 50 cutter suction dredger. The first dredging spot requires replacement of approximately 1 million m3 of sediments.

Consultancy: the determination and execution of the full dredging process from preliminary study of the technical parameters, by equipment strategy, methodology choice and dredging plan preparation, up to on-site support and day-to-day administration.

Challenge: Dredging in the operational water channel inside the port, lack of space to store material and limited equipment possibilities.